        Maintenance Cycle:

1.Fine maintenance for 1 month;

2.Minor maintenance for 1 -3 months;

3.Medium maintenance for 12 - 24 months;

4.Large maintenance for 60 - 120 months;

        maintenance Content:

Fine maintenance, mainly inspect the oil amount, adjust the gap between different parts, firm the bolt, replace the impact plate or inspect the wearing of impact plate, mend the feeder;

Minor maintenance inspect the wearing of the tooth surface and the impact plate, replace it when necessary;

Medium maintenance: replace the spare parts of the feeding opening, replace the transmission pinion and bearing ,disassembly the reducer ...

ball mill top
Focus SBM : News Center
Ball Mill Manufacturer - Shanghai Shibang - News Center

How to do when the ball mill enter the belly bulge

With regard to the use of ball mill belly bulge appeared in the process, there are several factors:

Firstly, to see whether the ball mill to the mine mouth spit normally expected, if not properly spit expected, is likely to lead to bulging belly ball mill;

Secondly, listen to the sound of the ball mill, if the smaller changes the sound stuffy, it is very possible to be ball bulging belly;

Then, look at the current ball mill control cabinet, so they think that when the current value is likely to become larger Mill expansion belly of the precursor is in fact not the case, if the ball bulging belly, its current value is become small.

ball Mill Operating principle: This ball mill is horizontal type and tubular running device, has two warehouses. This machine is grid type and its outside runs along gear. The material enters spirally and evenly the first warehouse of the milling machine along the input material hollow axis by input material device. In this warehouse , there is a ladder scaleboard or ripple scaleboard, and different specification steel balls are installed on the scaleboard, when the barrel body rotates and then produces centrifugal force ,at this time , the steel ball is carried to some height and falls to make the material grinding and striking. After grinded coarsely in the first warehouse, the material then enters into the second warehousefor regrinding with the steel ball and scaleboard. In the end, the ball is discharged by output material board and the end products are completed.

Shanghai Shibang Machinery Co., Ltd.

International Dept.1: Tel: 0086-21-58383098     Fax:0086-21-58383058

International Dept.2: Tel: 0086-21-58383028     Fax:0086-21-58383058

International Dept.3: Tel: 0086-21-58383058     Fax:0086-21-58383058

International Dept.4: Tel: 0086-21-58383003     Fax:0086-21-58383058

International Dept.5: Tel: 0086-21-58383022     Fax:0086-21-58383058