
1. fine maintenance for 1 month;
2. minor maintenance 1 -3 months;
3. medium maintenance 12 - 24 months;
4. large maintenance 60 - 120
Ball Mill
Maintenance Content: fine maintenance, mainly inspect the oil amount,adjust the gap
between different parts, firm the bolt,replace the impact plate
orinspect the wearing of impact plate
,mend the feeder
; minor maintenance inspect the wearing of the tooth surface and the impact plate, replace it when necessary; medium maintenance:replace the spare parts of the feeding opening
, replace the transmission pinion and bearing ,disassembly the reducer for inspection. Big gear can be adjusted according to different situation,hollow shaft
should be measured after 3-5 years’ operation; large maintenance: disassembly the whole machine for washing, measuring , and replace or mend the big gear ,hollow shaft
,bowl liner, transmission shaft , pinion and shell according to the wearing of the spare parts.After large maintenance, the machine must experiencepreoperation
before it works.Shanghai Shibang Machinery Co., Ltd.
International Dept.1: Tel: 0086-21-58383098 Fax:0086-21-58383058
International Dept.2: Tel: 0086-21-58383028 Fax:0086-21-58383058
International Dept.3: Tel: 0086-21-58383058 Fax:0086-21-58383058
International Dept.4: Tel: 0086-21-58383003 Fax:0086-21-58383058
International Dept.5: Tel: 0086-21-58383022 Fax:0086-21-58383058
